| << Tunnel corridors #2 and #3 go up at the hobbit house! | Ep69 2026-10-26 |
The connecting corridor tunnels start to take shape, as I wall them in with boards and waterproofing. ドームをつなぐ廊下に壁を張ります!日本語版字幕もあります。
Original music composed by Jay Underwood (jay.underwood.7577 at gmail.com).
| << Tunnel corridors #2 and #3 go up at the hobbit house! | Ep69 2026-10-26 |